Report

Energy yield report: Budapest PV plant case study

AUG 10, 21 | 2 AM · LAURA RODRÍGUEZ

Get the methodology used to compute the energy yield of the Airport photovoltaic plant case study and their results.

The energy yield results were computed considering all the losses incurred up to and including the substation level.

This report is part of the deliverables RatedPower’s software does for you.

What to expect from this report

The document is a comprehensive report with 27 pages. Everything you've to bear in mind before cast the proposal to your EPCist or off-taker.

It includes:

  • Site
  • Topography, meteo and albedo
  • Equipment
  • Methodology
  • Losses
  • Energy yield results

 

By clicking the button above, I consent to RatedPower and its parent company Enverus storing and processing the personal information submitted above to provide me the content requested in accordance with the Privacy Policy. In compliance with the information obligation established by the data protection regulation, we provide you the information regarding the processing of your personal data, how to unsubscribe, as well as our privacy practices and commitment to protecting your privacy in our Privacy Policy.