Guide

Sizing your BESS in the best way

OCT 11, 22 | 2 AM · IRENE NEGRO

Battery energy storage systems (BESSs) are key to integrating large amounts of solar and wind generation into power grids.

When designing a BESS, the most challenging engineering work is in establishing the appropriate size for the system and determining whether it will generate a positive return on investment.

RatedPower’s software now includes functionality to automate and speed up the feasibility study process for identifying viable utility-scale PV projects with BESS.

Let us walk you through the world of BESS. Case study inside!
 

What's included?

This guide looks at the process of sizing up batteries for a PV plant looking at three specific criteria in detail:

  • Services provided
  • Profitability
  • Tender recommendations or requirements

 

 

By clicking the button above, I consent to RatedPower and its parent company Enverus storing and processing the personal information submitted above to provide me the content requested in accordance with the Privacy Policy. In compliance with the information obligation established by the data protection regulation, we provide you the information regarding the processing of your personal data, how to unsubscribe, as well as our privacy practices and commitment to protecting your privacy in our Privacy Policy.