SUCCESS STORY
Reducing 95% of PV layout generation timeline with software
MAY 30, 24 | 9 AM
AboitizPower is a leading developer and independent power producer at the forefront of the Philippines market. After using RatedPower their team was able to reduce their PV layout generation time by up to 95%, while cutting engineering due diligence time from six months to four months.
"We did it manually before: we would be doing for a 100 MW project 4 hours to do a conceptual layout. That was life before RatedPower" - Cris Vincent Alidon, Vice President for Engineering and Execution at AboitizPower.
Don't miss out on this interview to see how AboitizPower navigates engineering challenges, enhances their PV projects' efficiency, and maintains agility in a competitive industry using RatedPower's software.