Webinar
Substation engineering: A-Z
NOV 03, 22 | 2 AM · SOUKAYNA JERMOUNI
RatedPower automatically generates the best solution for an interconnection facility and chooses between a switching and breaking station, a line to transformer substation or a single/double busbar substations. Over this 45-minute session we’ll dive deep on:
- The steps RatedPower's software takes to determine the electrical features of a substation.
- Why did we pick that criteria —and why it’s important for solar developers and EPCists
- A hands-on session where we’ll design an hybrid PV plant and we’ll go through the interconnection facility documents RatedPower delivers